An Environmental Impact Assessment (EIA) ensures that the environmental effects of a proposed development are properly considered. For more information see: Environmental Impact Assessment. It provides the local planning authority with better information about certain types of projects, enabling them to make a more informed decision about whether permission should be granted and to allow imposition of more appropriate conditions and obligations to mitigate possible negative impacts.
It will typically include assessment of appropriate alternatives, including an alternative site assessment (ASA).
[edit] Purpose
The purpose of an ASA is to explore whether or not the site proposed for a development is the most suitable one, or whether alternative sites could be preferable.
Due to the impact they may have on the outcome of the planning process, it is important to have ASAs undertaken during the very early stages of a project - not as a process of post-rationalisation after a site has already been selected, and very early appraisals of potential sites may be carried out by a surveyor before the appointment of the consultant team during the business justification stage.
[edit] ASA guidance
There is no formally prescribed process or methodology for undertaking an ASA. The process should be adapted to the characteristics of different projects. However, the Surrey County Council offers suggested stages of an ASA, including:
[edit] Assessment of requirements
- Physical, including size of site and building requirements.
- Access, including distance to and from roads.
- Location, including desirability based on the existing or proposed area of operations.
- Relationships, including proximity to any existing/remaining premises, suppliers, markets.
[edit] Criteria for ASAs
- Whether the site is previously developed land or in active use for the proposed development.
- Likely visual impact.
- Standard of access.
- Likely impact on residential amenities.
- Distance from designated (i.e. environmentally sensitive) areas.
- Flood risk.
- Site availability (e.g. evidence of whether the site is listed for sale).
[edit] Related articles on Designing Buildings
Featured articles and news
Reslating an ancient water mill
A rare opportunity to record, study and repair early vernacular roofs.
CIOB Apprentice of the Year 2025/26
Construction apprentice from Lincoln Mia Owen wins this years title.
Insulation solutions with less waste for a circular economy
Rob Firman, Technical and Specification Manager, Polyfoam XPS explains.
Recycled waste plastic in construction
Hierarchy, prevention to disposal, plastic types and approaches.
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.
Prostate Cancer Awareness Month
Why talking about prostate cancer matters in construction.
The Architectural Technology podcast: Where it's AT
Catch up for free, subscribe and share with your network.
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.